Feb. 23rd, 2009

gsh: (Default)
1) The regional facilities management put in a new HVAC into one of our buildings.
2) The contractors wired it into the circuits that are protected by UPS.
3) When the HVAC went on full bore, it overloaded a wire, and brought down
a bunch of stuff that was supposed to be on UPS.
4) Regional facilities management then attempts to bill us for the repair.

Is that a textbook case of adding insult to injury?

June 2015

S M T W T F S
 123456
78 910111213
14151617181920
21222324252627
282930    

Most Popular Tags

Page Summary

Style Credit

Expand Cut Tags

No cut tags
Page generated Mar. 25th, 2026 12:54 pm
Powered by Dreamwidth Studios